SP Ring Road Six-Laning: Ahmedabad's Rs 2,000 Crore Traffic Fix

Ahmedabad's SP Ring Road turns six lanes by 2026, easing commutes and boosting property corridors.

Enquire Now

AUDA's Rs 2,000 Crore SP Ring Road Expansion: What It Means for Ahmedabad

The Ahmedabad Urban Development Authority (AUDA) is moving ahead with one of the city's most significant infrastructure upgrades in two decades. The Sardar Patel (SP) Ring Road, the 76-km corridor encircling Ahmedabad, is being widened from four lanes to six at an estimated cost of Rs 2,000 crore. AUDA is set to begin the long-awaided expansion work of the Sardar Patel (S.P.) Ring Road by December 7, with most technical procedures now complete, and the project aims to convert the existing four-lane stretch, connecting six National Highways and eleven State Highways, into a six-lane corridor.

The expansion has been split into two packages for execution. The first phase covers a 37-km eastern stretch while the second phase covers a 39-km western stretch, together budgeted at roughly Rs 2,200 crore. Of the total project cost, around Rs 1,200 crore spent by the contractor on the ring road will be reimbursed over the next 15 years through annuity payments, meaning the road is being delivered on an annuity model rather than a straight toll-funded build.

This isn't the first attempt to widen the ring road. AUDA had approved a Rs 200-crore widening plan back in 2019, but the deal collapsed in 2021 when AUDA would not extend the toll concession, prompting the original contractor to walk away and stalling the project for years. The current push, re-tendered in February 2025 with a foundation stone laid in August 2025, finally moved into construction with formal work beginning in December 2025.

A key advantage of this expansion is that it needs no fresh land acquisition. AUDA will not need to acquire new land for the project; instead, the existing 60-meter-wide road will be utilised for the expansion, with the new design featuring three lanes on each side while maintaining the service roads. The plan also includes two new flyovers, at Aslali Junction and the Dholera Expressway junction, along with an upgrade of the Tragad underpass to six lanes.

The scale of the traffic problem explains the urgency. The S.P. Ring Road currently carries around one lakh vehicles every day, making the upgradation essential to ease traffic congestion and enhance road safety. The corridor links major nodes including Vaishnodevi, Chandkheda, Gota, Shela-South Bopal, Sanand, Naroda, and Zundal, so a bottleneck here has ripple effects across the entire city's commute patterns.

For homebuyers and investors, the areas best placed to gain are Vaishnodevi Circle, Chandkheda, Gota, Shela–South Bopal, the Sanand–Sanathal industrial belt, Naroda–Nikol–Hathijan, and the newer Kalol growth corridor, though a wider road alone won't push up prices everywhere, and it works best where jobs, schools, and real buyer demand already exist. This mirrors what happened when the original ring road opened in 2004 and gradually anchored two decades of residential and industrial growth around it.

The upgrade also strengthens the business case for large-format industrial and mixed-use developments already anchored along the corridor, such as Mahindra's own Origins by Mahindra, Ahmedabad, a 340-acre industrial land cluster developed in partnership with the International Finance Corporation. Better connectivity along the ring road directly benefits such logistics-and-manufacturing hubs by cutting freight movement time to national highway networks.

AUDA has been careful to flag execution discipline as construction rolls out. AUDA officials said efforts will be made to ensure that commuters face minimal inconvenience during the construction phase, a signal that phased execution and service-road continuity will be prioritised as work progresses toward the end-2026 target.

SP Ring Road Six-Laning Update - photo 2

MAHINDRA Projects

MAHINDRA LIFESPACES MURUD
Upcoming

MAHINDRA LIFESPACES MURUD

Murud, Raigad (near Alibaug)

2, 3 BHK • Price on Request

Upcoming coastal homes near Murud-Janjira Fort

MAHINDRA LIFESPACES PANVEL
Upcoming

MAHINDRA LIFESPACES PANVEL

Panvel, Mumbai

1, 2, 3 BHK • Price on Request

Upcoming Mahindra homes near NMIA

Mahindra Lifespaces Thane
Upcoming

Mahindra Lifespaces Thane

Thane, Mumbai

2, 3 BHK • Price on Request

Upcoming Mahindra address in Thane

MAHINDRA ORIGINS BY MAHINDRA CHENNAI PHASE 2B
Upcoming

MAHINDRA ORIGINS BY MAHINDRA CHENNAI PHASE 2B

Eliambedu, Chennai

Industrial & Commercial Plots • Price on request

95-acre industrial expansion on NH-16

Mahindra SEZ Jaipur
Upcoming

Mahindra SEZ Jaipur

Ajmer Road, Jaipur

Commercial Plots • Rs 60 Lakhs onwards

3000-acre Mahindra World City SEZ

Mahindra World City Dholera
Upcoming

Mahindra World City Dholera

Dholera SIR, Ahmedabad

Industrial, Commercial, Residential • Price on Request

Rs 2,000 Cr integrated business city on DMIC

MAHINDRA ALEMBIC
Pre-Launch

MAHINDRA ALEMBIC

Hope Farm, Whitefield, Bangalore

2, 3 BHK • Rs 1.43 Cr onwards*

Pre-launch homes near Hope Farm Metro

Mahindra Chembur Redevelopment
Pre-Launch

Mahindra Chembur Redevelopment

Chembur, Mumbai

2, 3 BHK • Price on Request

₹1,700 Cr redevelopment at Diamond Garden

Get In Touch

Request a Callback

Back

Questions, Answered

What exactly is being built on the SP Ring Road?
AUDA is widening the existing 76-km Sardar Patel Ring Road from four lanes to six lanes, along with upgraded service roads, two new flyovers and an expanded underpass at Tragad.
How much will the SP Ring Road expansion cost?
The project is estimated at around Rs 2,000-2,200 crore, split into an eastern and a western package, and is being funded through an annuity model repaid over 15 years.
When will the six-lane SP Ring Road be completed?
AUDA has targeted completion by the end of 2026, with construction formally starting in December 2025 after a foundation stone laying in August 2025.
Will AUDA acquire new land for this project?
No. The expansion will use the existing 60-metre-wide road corridor, so no fresh land acquisition is required, which keeps the project timeline more predictable.
Which areas of Ahmedabad benefit most from this widening?
Vaishnodevi Circle, Chandkheda, Gota, Shela-South Bopal, the Sanand-Sanathal industrial belt, Naroda-Nikol-Hathijan and the emerging Kalol corridor are expected to see the biggest connectivity gains.
Why does the SP Ring Road need widening now?
The ring road currently carries around one lakh vehicles daily, well beyond what its existing four lanes can handle smoothly, making six-laning necessary for safety and traffic flow.
Has this widening project faced delays before?
Yes. AUDA first approved a smaller Rs 200-crore widening plan in 2019, but the contractor withdrew in 2021 after a concession dispute, stalling the project until it was re-tendered in 2025.
How does this project affect industrial land near the ring road?
Better road capacity improves freight and commute access for industrial clusters along the corridor, including large-format developments like Origins by Mahindra, Ahmedabad, near the ring road network.
Is the SP Ring Road widening a toll road project?
It uses an annuity-based funding structure rather than a straightforward toll model, with the contractor's spend reimbursed by AUDA over 15 years.
Should homebuyers factor this project into their location decisions?
It's a genuine near-term catalyst since no land acquisition is needed, but buyers should still verify RERA status, sanctioned layouts, and actual demand drivers like jobs and schools in the specific micro-market.

This site is published for general information only and is not an offer or contract. Prices, plans, and specifications are indicative and may change without notice. Buyers should verify all details independently before deciding. About · Projects